In this project, 2 tunnels (Eagle’s
Nest Tunnel and Sha Tin Heights
Tunnel), 1 enclosed section (Tai Wai Enclosed Section),
4 portal buildings and 1 administration building are
included. Each portal building has installed S7-400H PLC
which are used to communication with S7-400H PLC in
administration building. S7-300 and S7-200 PLCs are used
to monitor and control the systems including tunnel
ventilation system, tunnel lighting system, fire
services, chiller plant and most of equipments in
buildings.