Project Name
Category
Lion Rock Tunnel Lighting Control System
Cross-Harbor Tunnel Lighting System
Tunnel Lighting System
Route 8 Eagle's Nest Tunnel and Associated Works
Hong Kong Polytechnic University Student Project 2004—Siemens Car Park
Cooperation with University
Hong Kong PolyU Student Project 2005—Pharmaceutical Packaging Production Line
University of Macau Student Project—RFID For Casino Application
Caltex Wastewater Treatment PLC Control System HMI Modification
Haeco Wastewater Treatment PLC Control System
Sewage Treatment
Yuen Long Sewage Treatment Works System
Polytechnic University Student Project 2004—Siemens Car Park
Auto Car Park System
Kowloon Auto Car-Parking System
EMCP Asian Mansion Shanghai Car Park System
MTR West Rail Tin Shui Wai Station ECS PLC System
Environ.Monitoring & Control
MTR Tsim Sha Tsui Station ECS PLC System
MTR West Rail Pat Heung Maintenance Centre ECS PLC System
Cheung Kong Center Oil Tank Level Monitoring System
Oil Tank Monitoring Control
Caltex Loading Bay 1 & Bay 8 System Maintenance
San Tin Modification Work for Traffic Controller
Macau Rio Hotel ECS HMI Modification
Chiller Plant System
EMSD Headquarter Solar System Central Monitoring System
Science Park CCMS of Lighting Control System for Building 5
HKIA High Mast Lighting
Residence Bel-Air Automated Refuse Collection System
Automated Refuse Collection System
Cheng Du Airport Automated Refuse Collection System
Matilda International Hospital Pumping System
Lion Rock Tunnel Electrical System Modification
Wetland Pumping Station Control System
Copyright © 2007-2008 Mice Engineering Limited. All Rights Reserved Add:Room 18, 12/F.,Metro Centre, Phase 1,32 Lam Hing Street, Kowloon Bay,Hong Kong. Tel: +852 2146 8797 / +852 2148 7323 Fax: +852 2146 8843 E-Mail:service@miceeng.com