Lion Rock Tunnel Lighting Control System

Print】【Back to Mice Project

     The Lion Rock Tunnel is duel-bound tunnel, which connecting Sha Tin in the New Territories and Kowloon near Kowloon Tong. The daily total throughput is approximately 90,000 vehicles in 2000. In order to avoid the hazardous‘black hole’effect of drivers, ensuring that illumination in a tunnel entrance is continuously changed automatically to match the changes of exterior daytime brightness is very important. Fixed luminance photometers were mounted at exterior of tunnel. After calculating the data of luminosity by PLC, several stages of illumination could be output for providing continuously changes of illumination.


Second Lion Rock Tunnel


Lighting System Control Panel


System Structure


A.B.PlC

Print】【Back to Mice Project】【Top

Copyright © 2007-2008 Mice Engineering Limited. All Rights Reserved  
Add:Room 18, 12/F.,Metro Centre, Phase 1,32 Lam Hing Street, Kowloon Bay,Hong Kong.
Tel: +852 2146 8797 / +852 2148 7323 Fax: +852 2146 8843 E-Mail:service@miceeng.com